View Cart  |  About Us

Pumps  |  Flowmeters  |  Tanks  |  Accessories  |  Calibrations

 Wall Mounted Pump

Mounting Location

  • Choose an area located near the chemical supply tank, chemical injection point and electrical supply. Although the pump is designed to withstand outdoor conditions, a cool, dry, well ventilated location is recommended. Install the pump where it can be easily serviced.

  • Mount the pump to a secure surface or wall using the enclosed hardware. Wall mount to a solid surface only. Mounting to drywall with anchors is not recommended.

  • Do not mount the pump directly over your chemical container. Chemical fumes may damage the unit. Mount the pump off to the side or at a lower level than the chemical container opening.

  • Mounting the pump lower than the chemical container will gravity feed the chemical into the pump. This "flooded suction" installation can reduce the time required to prime the pump. Install a shut-off valve, pinch clamp or other means to halt the gravity feed to the pump during servicing.

  • Your solution tank should be sturdy. Keep the tank covered to reduce fumes.

  • Be sure your installation does not constitute a cross connection with the drinking water supply. Check your local plumbing codes.

Caution: Always wear protective clothing, face shield, safety glasses and gloves when working on or near your metering pump.
Additional precautions should be taken depending on the solution being pumped. Refer to MSDS precautions from your solution supplier.

 

Note: All diagrams are strictly for guideline purposes only. Always consult an expert before installing the Chem-Feed/FlexFlo pump on specialized systems. The Chem-Feed/FlexFlo should be serviced by qualified persons only.

© 2006 Blue-White Industries
See About Us for additional company information.
phone: 714-893-8529  |  fax: 714-894-9492
Contact us (e-mail):
    |    | 

Trademarks | Terms and Conditions | Privacy Policy